ACME Solar has commissioned 66.68 MW of solar power generation capacity and 300 MWh of Battery Energy Storage System (BESS) capacity through its subsidiary in Bikaner, Rajasthan. This commissioning marks the first phase of its hybrid renewable energy project, bringing ACME Solar's total operational renewable energy capacity to approximately 3.05 GW. Additionally, the company's operational BESS capacity has exceeded 4 GWh, now reaching 4.16 GWh.