China National Nuclear Power (CNNP) announced that as of December 31, 2025, the company had 26 operational nuclear power units under its control, with an installed capacity of 25,000.00 MW. Additionally, it had 19 nuclear power units under construction or approved for construction, with an installed capacity of 21,859.00 MW. As of December 31, 2025, the company's nuclear power units generated 200.807 billion kWh of electricity, a year-on-year increase of 9.66%; the cumulative on-grid electricity was 187.847 billion kWh, a year-on-year increase of 9.69%. Both generation and on-grid electricity met the annual plan. For 2026, the company's full-year electricity generation target is 259.2 billion kWh, with nuclear power planned to generate 210 billion kWh and new energy sources planned to generate 49.2 billion kWh.