Musk retweeted a post from @wallstengine stating that SpaceX aims to deploy over 1 gigawatt of ground-based AI infrastructure per month by the end of 2027, with the current pace at approximately 0.5 gigawatts per month. Based on power plant-side capacity metrics, the original post compared the current scale to roughly 220,000 NVIDIA GB300 chips plus CPUs, networking, and cooling facilities; this is neither purely GPU power consumption nor a verified chip procurement quantity, nor is it a metric for computing performance operations.