Musk reposted a SpaceX tweet stating that SpaceX has ordered 100 GW/year of HJT solar manufacturing equipment from Germany's Singulus to support Starmind satellite production in Bastrop, Texas. SpaceX previously stated that the contract aims to provide a durable option for advanced solar cell manufacturing.