Discussions at the OCP Global Summit indicate an accelerated migration towards 800V DC power architectures, aiming to enhance power conversion efficiency as rack power density evolves from the current approximately 145 kW to over 300-500 kW. The future expansion bottlenecks for AI infrastructure will increasingly be power availability, cooling capacity, and DC capacity, rather than merely silicon chip supply.